Installation Instructions |
|
Step One
Check that walls are even, otherwise fix battens to wall.
|
|
Step Two
Cut EDGING to size with fine tooth saw. Fit in vertical position at wall edge (if starting in corner, fit
UNIVERSAL CORNER) and staple, pin or glue to wall.
|
|
Step Three
First cut panels to length using fine tooth saw. Fit first panel ROUNDED into EDGING or UNIVERSAL
CORNER. Apply silicon adhesive to the back of the panel and glue to wall or battens.
|
|
Step Four
Panels can also be fixed to wall or battens by stapling or nailing through the U SHAPE panel edge
instead of or as well as applying adhesive to the back of the panels.
|
|
Step Five
Repeat until whole wall is covered. To install the last panel, fit the EDGING or UNIVERSAL CORNER
and measure the distance left. Deduct 6mm from the measurement and cut the panel to fit.
NOTE: For shower or bath walls, panel joins and bottom of panels should be thoroughly sealed with
mould resistant silicone sealant.
|
|
Step Six
For ceiling application. To fit last panel into the CORNICE, place the CORNICE already on the panel
before putting it to the ceiling and glue it all (panel + CORNICE) to the ceiling. |
|
IMPORTANT
For a totally waterproof seal use mould resistant silicon sealant (eg Selley's Roof & Gutter Sealant) in
all joints and channels during assembly. Run a continuous bead of silicon down the back lug of each
panel. This will provide secure leak proof and mould free joins. For panel adhesive use a glue who’s
manufacturer has approved the product compatible with PVC panel and wall substrate. Selley's Roof &
Gutter Sealant when used as a glue is also the most effective. |
|
WARNING
It is recommended that DECOFORM is not installed in front of or next to a fireplace or hot cooking
appliances otherwise distortion may occur. Do not use outside, except for eave lining. To clean use a
damp cloth. Do not use abrasive detergents. |
|